CANKIRI KARATEKIN UNIVERSITY Bologna Information System


  • Course Information
  • Course Title Code Semester Laboratory+Practice (Hour) Pool Type ECTS
    Ventilation Systems CİK206 SPRING 2+1 C 4
    Learning Outcomes
    1-Explains ventilation methods
    2-Makes a fan selection
    3-It resizes by making the calculation of the ventilation channels.
    4-It manufactures straight ducts and other duct equipment used in ventilation systems.
    5-Commissioning ventilation systems, solving noise problems, testing and adjusting
  • ECTS / WORKLOAD
  • ActivityPercentage

    (100)

    NumberTime (Hours)Total Workload (hours)
    Course Duration (Weeks x Course Hours)14342
    Classroom study (Pre-study, practice)10330
    Assignments0000
    Short-Term Exams (exam + preparation) 0000
    Midterm exams (exam + preparation)4011414
    Project0000
    Laboratory 0000
    Final exam (exam + preparation) 6011919
    0000
    Total Workload (hours)   105
    Total Workload (hours) / 30 (s)     3,5 ---- (4)
    ECTS Credit   4
  • Course Content
  • Week Topics Study Metarials
    1 Introduction to Ventilation R1
    2 Classification of Ventilation Systems R1
    3 Ventilation System Elements R1
    4 Fans R1
    5 Grilles R1
    6 Ventilation system load calculations R1
    7 Design of Ventilation Channels R1
    8 Ventilation Applications R2
    9 Production of air duct and Fittings R2
    10 Clamp Manufacturing R2
    11 Straight air duct manufacturing R2
    12 T air duct Manufacturing R2
    13 Elbow Manufacturing R2
    14 Test, Tuning And Balancing Sound And Acoustics R2
    Prerequisites -
    Language of Instruction Turkish
    Responsible LEC. TURGUT ODABAŞIOĞLU
    Instructors -
    Assistants LEC. EMRAH ŞAHİN
    Resources R1. LESSON NOTES (TURGUT ODABAŞIOĞLU) R2. Machinery and equipment required for the manufacture of ventilation ducts
    Supplementary Book -
    Goals Determining the ventilation needs of the spaces according to the usage purposes, making the ventilation calculations. Making the duct sizing according to the calculations. Manufacturing the ducts and other elements used in the ventilation systems.
    Content Introduction to ventilation, Classification of ventilation Systems. Ventilation System Elements (fans, grilles, diffusers). Design of ventilation ducts, ventilation applications Construction of ducts and fittings. Testing, adjustment, balancing
  • Program Learning Outcomes
  • Program Learning Outcomes Level of Contribution
    1 Recognizes the scientific principles related with air conditioning and refrigeration systems. -
    2 Recognizes the main components and accessories of air-conditioning and cooling systems and describes the functions. 2
    3 Reads the projects related to air conditioning and refrigeration systems. Draws projects with computer-aided programs. 2
    4 Calculates the heat loads based on the selection in air-conditioning, cooling and heating systems. -
    5 Knows electrical control systems and automatic control circuits and makes connections. -
    6 Calculates pipe diameter in cooling systems and makes connections according to the technique. -
    7 Designs, manufactures and assembles the duct connections in ventilation and air conditioning systems. 4
    8 Diagnoses and repairs malfunctions related to air conditioning and refrigeration systems, makes periodic maintenance. 1
    9 Communicates well with staff at the bottom of the workplace and managers. -
    10 Knows business management. -
    11 Knows standards and quality controls about the profession. -
    Çankırı Karatekin Üniversitesi  Bilgi İşlem Daire Başkanlığı  @   2017 - Webmaster