    programmable logıc controller CEL206 SPRING 3+1 C 4
    Learning Outcomes
    1-Recognizes the structure of programmable logic controllers. explains its functions
    2-Explains programming technique with ladder diagram. Compares relay control circuits with ladder diagram.
    3-Makes programming with a list of statements. Performs the conversion of ladder diagram and statement list programs to each other.
    4-Recognizes the concept of timer and counter in PLCs. Programs using timer and counter commands.
    5-Makes PLC applications.
  • ECTS / WORKLOAD
  • ActivityPercentage

    (100)

    NumberTime (Hours)Total Workload (hours)
    Course Duration (Weeks x Course Hours)14456
    Classroom study (Pre-study, practice)31030
    Assignments0000
    Short-Term Exams (exam + preparation) 0000
    Midterm exams (exam + preparation)4011010
    Project0000
    Laboratory 0000
    Final exam (exam + preparation) 6012020
    Other 0000
    Total Workload (hours)   116
    Total Workload (hours) / 30 (s)     3,87 ---- (4)
    ECTS Credit   4
  • Course Content
  • Week Topics Study Metarials
    1 Basic Principles of PLCs
    2 Basic Principles of PLCs
    3 Programming
    4 Programming
    5 Programming
    6 Programming
    7 Programming
    8 Comparing PLCs
    9 Comparing PLCs
    10 Comparing PLCs
    11 Industrial Applications
    12 Industrial Applications
    13 Industrial Applications
    14 Industrial Applications
    Prerequisites -
    Language of Instruction Turkish
    Responsible Lecturer İLKAY ÖZEROĞLU
    Instructors -
    Assistants -
    Resources R1- COURSE NOTES (Lecturer İLKAY ÖZEROĞLU)
    Supplementary Book -
    Goals Emphasizing the place and importance of PLC in automation systems, it produces automation solutions with PLC.
    Content Structure and functions of programmable logic controllers. Working principle of PLC, starting logic operation and basic logic operation commands. Programming technique with ladder diagram. Programming with a list .
  • Program Learning Outcomes
  • Program Learning Outcomes Level of Contribution
    1 Organizes work. Makes preparations for work. -
    2 Recognizes and uses machinery and equipment used in manufacturing, control, maintenance and commissioning processes in the factory. Knows the physical demands of electricity in the factory. -
    3 Performs commissioning and control operations in the factory. It detects faults -
    4 Performs periodic/protective maintenance of machinery and equipment. Eliminates malfunctions of electrical machinery and equipment. -
    5 Maintains and repairs the Protective/Safety installation. -
    6 Maintains and repairs internal and external installations. Installs machinery, equipment and installations. -
    7 Carries out activities related to professional development. -
    8 Evaluates the advantages and disadvantages of materials used in the electrical engineering industry -
    9 Reads and interprets engineering drawings and diagrams. Planning and designing. Interpret bar charts, critical-path-networks, assembly diagrams, circuit and schematic diagrams. 4
    10 Executes the discovery process. Performs inspection, testing and acceptance procedures. -
    11 Establishes the facility of lighting and power systems. Supervises the installation of transmission and distribution systems. -
    12 Placement, classification and adjustment of materials and equipment related to the system. Makes the selection, classification and adjustment of cable machinery and equipment suitable for the working environment. -
    13 Knows where to apply the law-based regulations on electrical sources, health and safety in the workplace. Applies the techniques detailed in standards and regulations. -
    14 Checks and repairs the installation. -
    15 Makes teamwork. Communicates. -
    Çankırı Karatekin Üniversitesi  Bilgi İşlem Daire Başkanlığı  @   2017 - Webmaster