|
Week
|
Topics
|
Study Metarials
|
|
1
|
Measurement information / Field work (Point marking, tacking, jalonation, length, angle and height measurement, scale, error)
|
|
|
2
|
Area calculation
|
|
|
3
|
Coordinate and triangulation calculations (Calculation Methods, Small Point Calculation, Side Point Calculation)
|
|
|
4
|
Coordinate and triangulation calculations (Frontal prediction)
|
|
|
5
|
Coordinate and triangulation calculations (Backward prediction method)
|
|
|
6
|
Polygonation (Poligonation types: open, closed, connected polygons)
|
|
|
7
|
Poligonation (open, closed, connected polygons)
|
|
|
8
|
Leveling, height measurement (Geometric leveling)
|
|
|
9
|
Leveling, height measurement (Trigonometric leveling)
|
|
|
10
|
Tacheometry
|
|
|
11
|
Drawing contour curves
|
|
|
12
|
Application of curves (horizontal curves)
|
|
|
13
|
Tack of slope piles
|
|
|
14
|
Numerical application
|
|